.png)
Why A Balanced Line Is The Wrong Goal, And What To Aim For Instead
Thursday, January 14, 2027
About the event
Stop chasing a flat line. Shape your WIP to your demand, so bottlenecks stay fed and the wafers that matter ship on time.
Webinar details
Every fab knows the pattern. A tool goes down, WIP piles up, and the team speeds up late lots to recover. A few days later the bubble reappears somewhere else.
The usual answer is to balance the line: keep roughly equal WIP in every part of it. But a flat line assumes every tool is equal and demand is steady. Neither is true. Bottleneck tools need WIP waiting in front of them, and orders rise and fall from week to week. So a balanced-looking line can still ship late, and a bubble can be perfectly healthy.
In this session
Flexciton's Product Director Sebastian Steele shows what your line should look like instead: your demand, projected backwards through the line. Using real, anonymised fab data, he shows how to tell a harmful bubble from a healthy one, and why the late wafers are often not where the bubbles are.
You will learn
- Why equal WIP across the line is the wrong target
- How to tell a bubble that will make wafers late from one that is just a healthy buffer
- How to work out the line shape your demand needs, and track against it
- How planning starts and priorities weeks ahead keeps bottlenecks fed and delivery dates safe
Who should attend
- Line-control and production-control managers
- Industrial engineers who own scheduler rules or capacity models
- Fab operations leaders accountable for output and on-time delivery
Duration
60 minutes, including 15 minutes of live Q&A with Sebastian
Speakers

