Product
View all products
Toolset scheduling
Effortlessly boost tool performance
Fab-wide scheduling
Connect and visualise the whole fab
Production planning
Optimize WIP flow over the next 4 weeks
Technology
The intelligence layer for better decision-making.
Solutions
By Teams
Fab management
Industrial engineering
Manufacturing
Production control
By Products
Toolset scheduling
Fab-wide scheduling
Production planning
Solutions
Explore use cases that solve real operational challenges
Resources
Blog
About
Careers
Contact
  • Product
    View all products
    Toolset scheduling
    Effortlessly boost tool performance
    Fab-wide scheduling
    Connect and visualise the whole fab
    Production planning
    Optimize WIP flow over the next 4 weeks
    Technology
    The intelligence layer for better decision-making.
  • Solutions
    By Teams
    Fab management
    Industrial engineering
    Manufacturing
    Production control
    By Products
    Toolset scheduling
    Fab-wide scheduling
    Production planning
    Solutions
    Explore use cases that solve real operational challenges
  • Resources
  • Blog
  • About
  • Careers
  • Contact
3
 min read

Goodhart’s Law and the Pitfalls of Targeting Load Port Utilisation on Photo Tools

It has been described as the law that rules the modern world, and its effects can be observed in every organisation. I’m referring to Goodhart’s law, named after British economist Charles Goodhart, who wrote the maxim: “Any observed statistical regularity will tend to collapse once pressure is placed upon it for control purposes.”

A common flavour of this effect is described in the following cartoon, based on a possibly apocryphal story of how central planning failed in a nail factory in the Soviet Union.


We have seen (less dramatic) examples of this effect at work in semiconductor wafer fabs. For instance, teams of operators may be measured on the number of lot moves that occur during their shift. In general, more moves per shift correlates with more wafers delivered on time to customers. However, this relationship breaks down if operators ‘game the system’ by loading batch tools with small batches at the end of the shift, thus wringing out a few extra moves in their shift, but hobbling the next shift.

Memorable though such examples are, they give the impression that Goodhart’s Law relies on people being uninterested in the ultimate goal that their organisation is pursuing. However, apathy is not usually the driving factor in Goodhart’s law; whenever lack of information, limited computational power or even an inability to concisely express our true preferences leads us to substitute a proxy metric for our true goal, the law is bound to rear its head. Former Intel CEO Andy Grove described the effect of such surrogate indicators as like “riding a bicycle: you will probably steer where you are looking”; and if where you’re looking isn’t perfectly correlated with the road ahead, you can expect a wobbly ride!

The intricacies of tools with multiple load ports

For a more subtle example of where using an imperfect measure as a target can lead to suboptimalities when scheduling a wafer fab, we were inspired by a post on the excellent Factory Physics and Automation blog looking at the relationship between load port utilisation and cycle time. In our experience, we have seen load port utilisation of a tool used as a target when designing both operator workflows and dispatching rules.

First, some quick definitions. Many tools in a fab have multiple ‘load ports’ where lots can be inserted into the tool, but then a limited chamber capacity so that, for instance, only one wafer can be processed in the chamber at the same time.

Figure 1: Example of a tool with 3 chambers and two load ports.


Consider the machine in Fig. 1 with three chambers and two load ports. Lots can be loaded in either load port, but then each wafer in the lot has to move through Chambers A, B and C one at a time. This means wafers may have to queue inside the tool, if the next chamber they need is still processing.  Lots must be unloaded at the same load port in which they were inserted. Suppose it takes each chamber 10 minutes to process a wafer, and we want to process two lots each consisting of three wafers. If we were only allowed to use a single load port, we would have to wait for the first lot to move through all three chambers and exit at the same load port before we can start processing the second lot. Fig.2 shows that for a simple model (that ignores transfer time between chambers), the second lot will have to wait 50 minutes before it can start processing.

Figure 2: Example of how the tool from Figure 1 would process two 3-wafer lots if only load port 1 were being utilised.


If however, an operator loads both batches into the two load ports at the same time (Fig. 3), the machine will pick up the first wafer of the second lot as soon as the first lot has finished processing in chamber A. Thus the second lot will only need to wait 30 minutes.

Figure 3: Same situation as Fig. 2 is shown, except in this case both load ports are available for use. Therefore, once all three wafers of Lot 1 have finished processing in Chamber A, Lot 2 can begin processing.  


Therefore, for a given level of WIP at a tool, we can expect higher load port utilisation to be correlated with reduced waiting and therefore improved cycle time.

Indeed, in cases where a wafer cannot be unloaded from a tool until all the wafers in the same lot are also ready to be unloaded (a common workflow), it can actually make sense to split lots before a chamber tool. For instance, if we have a lot of 6 wafers before the tool (see Fig. 1) – loading all the wafers as a single lot in a load port – it will take 80 minutes for all 6 wafers to move through the three chambers until we can unload the lot. If however, we split the original lot into two lots of three and load them into both load ports (as in Fig. 3), then the first lot can be unloaded after just 50 minutes, and potentially continue to its next step earlier.

How directly targeting load port utilisation can harm cycle time

As predicted by Goodhart’s Law, the correlation between load port utilisation and fab cycle time breaks down once we try to optimize directly for load port utilisation. This breakdown is particularly stark on photolithography tools, where process steps rely on a critical secondary resource: reticles. Reticles (also called photomasks) act like stencils in the expose step of a photolithography process, patterning the wafer with the desired features.  In most photo tools, reticles must be loaded onto the tool in containers, called pods, before the lots that require them can be loaded onto the machine. Therefore, if a lot is inserted into a load port early, the wafers could just be waiting inside the machine. Moreover, this also requires loading a reticle into the machine when it could have a more productive use elsewhere.

For a simple example, consider a toolset consisting of two of the tools from Fig. 1 (we can imagine chambers A, B and C are performing coat, expose and develop operations respectively).

Suppose we have just loaded a 3 wafer lot onto tool 1. The other load port of tool 1 remains free. Meanwhile on tool 2, both load ports are utilised, but there are only two wafers yet to be processed in Chamber A.

A lot (lot X) that requires a special reticle (of which only one exists) arrives. Due to a lot-level restriction, lot X can only run on tool 1. This sort of restriction is particularly common in photolithography where running consecutive photo layers through the same tool (even if there are multiple tools qualified for the operation) can reduce product variability caused by idiosyncratic aspects of the lensing to a particular tool (this is sometimes known as a ‘lot-to lens’ dedication).The operators on this toolset abide by the following rule for dispatching lots:

Rule 1: If a load port and the required reticle are available, load the reticle and the lot onto the tool.

Since tool 1 has a load port available, the operator immediately loads the reticle onto the machine, and puts lot X into the load port.

Ten minutes later, lot Y arrives at the toolset, also requiring the same reticle, and with a lot-level restriction forcing it to run on tool 2. Since the reticle is already loaded on tool 1, lot Y cannot be dispatched until lot X has finished processing and the reticle has been moved from tool 1 to tool 2. Assume, for the purpose of simplicity, the reticle moves instantaneously, both lots will have finished processing in 130 minutes time (see Fig. 4).

Figure 4: Example of processing on the two machine toolset when operators follow Rule 1 for dispatching lots


Imagine, however, the operators adopted the following workflow:

Rule 2:  If a load port and the required reticle are available and the tool can begin processing immediately (i.e. Chamber A is free), load the reticle and the lot onto the tool

In this case, lot X will not be immediately loaded onto tool 1, since Chamber A is initially occupied. After only 20 minutes though, lot Y can be loaded onto tool 2, to finish processing 50 minutes later, at which the reticle can be moved and lot X can start on tool 1. Thus, after just 120 minutes (as opposed to the 130 minutes under Rule 1), both lot X and lot Y will have finished processing. Therefore, we can see that by adopting rule 2, the cycle time, and hence the throughput of the toolset can be improved.

Figure 5: Example of processing on the two machine toolset when operators follow Rule 2 for dispatching lots.


In our experience of wafer fabs, we often see workflows akin to Rule 1, wherein operators fill the load ports of photo tools as soon as they are free, thus forfeiting the opportunity to use reticles earlier on different tools. Adopting a workflow like Rule  2, however, is more difficult since it requires operators to have foreknowledge of when the tool will be ready to process a new lot, and reacting promptly to load the tool at precisely this time.  In practice, particularly when operator availability is limited, you will risk increasing wait time because you leave the tool under utilised if you fail to load a lot as soon as a machine becomes available.

Using advanced optimization to handle Goodhart's Law

Flexciton’s scheduler can help to alleviate this problem by employing advanced optimization technology. It can predict when lots will arrive at the photo toolset and which reticles they will require, and then jointly schedule the reticles and lots on the toolset to obtain an optimized schedule. The knowledge of future arrivals crucially allows us to identify cases where loading a reticle onto a machine now is suboptimal, since a lot will soon arrive at another tool that can make use of the reticle sooner or that simply has a higher priority. Thus, following a Flexciton schedule, operators can dispatch to load ports when they become available, with minimal risk of harming cycle time due to locking in reticles prematurely.

However, we still are not immune to the curse of Goodhart’s Law. The cycle time of an optimized schedule is itself only a proxy for what we actually care about: producing more high quality wafers at a low cost per wafer. Over-optimizing for cycle time may lead to a solution with so many loads and unloads that the labour cost of running fab becomes prohibitive. Or, as described in one of our previous blog posts, the solution may require moving reticles so frequently between tools that we increase the chance of a costly breakage.

To solve this, we apply a technique suggested by Andy Grove himself: we use pairing indicators. Combining indicators, where one has an effect counter to the other, avoids the trap of optimizing one at the expense of another. This is why we typically pair cycle time with the number of batches (to account for limited operator availability) or the number of reticle moves (to keep the risk of reticle damage low), thus mitigating the perils of Goodhart’s Law.

‍

Share this:
TwitterLinkedInFacebook
Resources

Useful resources

Stay up to date with our latest publications.

Wrestling with Recipes

Insightful experiments expose the weakness of limiting the number of recipes enabled on a tool. The key findings are that this limitation can lead to an increase in fab cycle times by more than 40 percent.
Read more

Why Optimized Scheduling is the Answer to Balancing Reticle Moves and Cycle Time

The scarcity and fragility of reticles presents fab operators with a tradeoff that we have assessed by investigating three case studies where Flexciton's intelligent scheduler has been used to explore the different outcomes.
Read more

To Batch or Not to Batch?

Batch tools are purposefully built to process two or more lots in parallel. However, due to the complexity and volatility of the wafer fabrication environment, each day wafer fabs are challenged to make complicated batching decisions.
Read more

Understanding the Trade-offs in Preventative Maintenance for an Optimized Fab Performance

The tools used in a fabrication process are extremely sophisticated; requiring an extensive preventive maintenance regime to ensure reliable production. A big challenge faced by fab managers is getting in place optimal scheduling of preventative maintenance whilst still meeting their production KPIs.
Read more

User-focused Digitalisation: Empowering Wafer Fab Operators with Intelligent Software

In the challenge of digitising semiconductor wafer fabs, Flexciton aspires to play a pivotal role in cultivating highly skilled operators and managers—individuals who are empowered by our technology rather than being replaced by it. Learn more about our customer-centric approach in this blog from Valentina.
Read more

We Need To Embrace Complexity, Not Run Away From It

As next-gen designs become increasingly sophisticated, a more holistic and streamlined approach to the manufacturing process is vital.
Read more

Two Factors That Can Make Or Break Wafer Fab Throughput

Being able to control and maximise throughput is critically important to the health and profitability of a semiconductor business. If the factory in question is capacity constrained, then any percentage increase to total fab throughput can be converted into further revenue for the business.
Read more

A Review of the Two-phase Approach to Photolithography Production Scheduling

Reviewing technology literature is a common practice when developing a new approach to solving an existing problem. James Adamson, a Senior Optimization Engineer at Flexciton, has recently reviewed several technical papers on photolithography scheduling, one of which he found particularly interesting.
Read more

The Reticle Allocation Problem and How to Approach it [Tech Paper Review]

This week, Daniel Cifuentes Daza, one of the Optimization Engineers here at Flexciton, explores the problem of reticle allocation in the photo area by reviewing a technical paper by Benzoni, A. et. al
Read more

The Theory of Constraints

Any manageable system is limited by at least one constraint. So, what happens if the system in question is the most complex manufacturing process in existence?
Read more

The Flex Factor with... Will

Introducing Will, Lead Backend Engineer at Flexciton. Explore his daily tasks, ranging from crafting backend architecture to overseeing the codebase and managing technical debt in this month's edition of The Flex Factor.
Read more

The Pareto Principle of Wait Time

Because of bottlenecked toolsets, wafers will spend a great proportion of their cycle time queuing rather than processing. The longer or more uncertain the wait time, the higher risk of variability in the cycle time. This ultimately impacts the overall productivity of a fab.
Read more

The Pathway to the Autonomous Wafer Fab

The semiconductor industry is set to receive $1tn in investment over the next six years, driven by AI and advanced technologies, with over 100 new wafer fabs expected. However, labor shortages continue to pose a challenge, pushing the need for autonomous wafer fabs to ensure continued growth.
Read more

The Flex Factor with... Yichen

In this month’s edition of The Flex Factor, we introduce one of our QA Engineers: Yichen Tian. Have a read to find out what this serial multitasker does during her day-to-day.
Read more

The Flex Factor with... Sudesh

Say hello to Sudesh Lutchman; senior back end engineer, delivery manager for the Taiichi team here at Flexciton and aspiring jet pilot.
Read more

The Flex Factor with... Seb

Introducing Seb Steele; self-proclaimed 'colossal nerd', John Boyd super fan and all-round product person.
Read more

The Flex Factor with... Jamie

Say hello to Jamie, one of Flexciton's frontend developers. From watering his cactus to perfecting the user experience of our application, find out what he does during his day-to-day in this month's edition of The Flex Factor.
Read more

The Flex Factor with... Sully

Meet Sully, the Bucket Brigade team's backend wizard, as he shines in the spotlight for July's edition of The Flex Factor. Discover more about the diverse challenges he tackles during his day-to-day and the valuable career advice he wishes he had known earlier.
Read more

The Flex Factor with... Jannik

Please give a warm welcome to Jannik, our next team member to sit in the hot seat. In this edition of The Flex Factor, find out how Jannik juggles being both an optimization engineer and customer lead, as well as what get's him excited in the world of tech.
Read more

The Flex Factor with... Nitin

Meet Nitin, our Senior DevOps engineer and security guru. Keep reading to learn a bit more about him and what it's like work in DevOps at Flexciton.
Read more

The Flex Factor with... Lio

Meet Lio, a driving force behind client success as Flexciton's Technical Customer Lead. Discover more about her keen eye for collaboration and passion for innovation in this edition of The Flex Factor.
Read more

The Flex Factor with... Charlotte

This month on The Flex Factor, we get to know our Senior People & Talent Partner, Charlotte Conway! Find out a little more about her and how she creates a supportive environment that helps our whole team to thrive.
Read more

The Flex Factor with... James

Meet James Adamson, one of our senior optimization engineers here at Flexciton. Many, many moons ago he was an aspirant farmer, now he’s designing and improving our scheduling algorithms.
Read more

The Flex Factor with... Felipe

Join Felipe as he shares his typical day at Flexciton, highlights the most rewarding aspects of his role and offers valuable career advice in this month’s edition of The Flex Factor.
Read more

Multi-objective Fab Scheduling: Exploring Scenarios and Tradeoffs for Better Decision Making

Building and maintaining any form of scheduling solution to be flexible yet robust is not an easy undertaking. Commonly, fab managers have resorted to rule-based dispatch systems or other discrete-event simulation software that asks a simple question: do I care more about getting wafers out the door, or reducing the cycle time of those wafers?
Read more

The Flex Factor with... Amar

On this month's edition of The Flex Factor, we're introducing Amar. Solutions engineer by day and the front man of Flexciton's band by night, find out a bit more about him and what he does for the team.
Read more

Switching to Autonomous Scheduling: What is the Impact on Your Fab?

From guaranteed KPI improvements to reducing fab workload by 50%, this blog introduces some of the benefits of Autonomous Scheduling Technology (AST) and how it contrasts with the scheduling status quo.
Read more

Scheduling as a Cornerstone of the Smart Factory [Part 1]

The problem with complex systems is that there’s so much variability and interaction, it's hard to get actionable insights from data. In Part 1 of this blog, Ben Van Damme explains that instead of accepting the complex nature of a fab, factories can control it using advanced scheduling.
Read more

Security and the Cloud: Should We Really Keep Everything On-prem?

Ray Cooke delves into the pivotal considerations surrounding cloud adoption in the context of wafer fabrication. For those reading sceptically, uncertain about the merits of cloud integration, or perhaps prompted by concerns about lagging behind competitors—this blog endeavours to shed light on key areas of relevance.
Read more

Scheduling Time Constraints in Wafer Fabrication

In a highly complex wafer fabrication environment, even the most advanced fabs struggle with scheduling time constraints. Begun Efeoglu Sanli, one of our Optimization Engineers, reviews a recently published technical paper on this particular subject.
Read more

Scheduling as a Cornerstone of the Smart Factory [Part 2]

In Part 2 of this blog, Ben Van Damme delves further into the potential of advanced optimization-based scheduling for wafer fabs in the not too distant future.
Read more

Scheduling Innovations: Academic Research and its Adoption in the Semiconductor Industry

This article focuses on innovations in scheduling: algorithms which assign lots to machines, decide in which order they should run, and ensure any required secondary resources are available.
Read more

Position Vacant: Are Chip Companies Really Running Out Of People?

The semiconductor industry worries that it won’t have enough workers to run its new fabs. But there’s a labour problem right now at legacy facilities. Could disruptive technologies help to solve this problem?
Read more

Maximising Wafer Fab Performance: Harnessing the Cloud's Competitive Edge

To cloud, or not cloud, that is the question. As other industries make the leap towards cloud technology, uptake with chipmakers continues to lag behind. In this article, Laurence explores the potential benefits of cloud adoption to equip Fab Managers with the motivation to reconsider the question.
Read more

Managing The Human Side Of Smart Manufacturing

Change management is just as important as new technology in a successful implementation. Jamie Potter has his say on what he thinks service providers can do differently to help fabs adopt new technologies.
Read more

Looking Into The Future: How Advanced Optimization Can Manage Timelink Constraints (Part 1)

Timelinks are one of the most challenging aspects of a wafer fab to navigate and significantly increase the complexity of scheduling it. We take a dive into a case study that shows how optimization can be used to manage timelinks to alleviate pressure on bottleneck tools.
Read more

Machine Says No – Is There A Way Around The Legacy Equipment Shortage?

Manufacturing equipment makers are under pressure to meet new fabs’ demands, with a serious knock-on effect for legacy chip makers. But can they increase capacity without increasing their number of tools?
Read more

Looking Into The Future: How Advanced Optimization Can Manage Timelink Constraints (Part 2)

In our second case study, we consider a more complex problem where a trade-off must be made between the cycle time of high priority lots and violating certain timelinks.
Read more

Is It Time to Redefine the UK's Role Within the Semiconductor Industry?

Jamie shares his thoughts on the UK’s £1bn semiconductor strategy, why he thinks there's untapped potential with disruptive technology, and how the UK’s abundant talent pool could be the key for our growth in the global industry.
Read more

Has the EU Chips Act Failed Before it's Started? Industry Strategy Symposium 2023

The big theme at this year’s SEMI Industry Strategy Symposium (ISS) conference was ‘How does Europe fulfil its ambition by 2030’. Jamie Potter shares his thoughts on the steps being taken to achieve its ambitious goal.
Read more

It’s Time For The Semiconductor Industry To Embrace Smart Manufacturing

With industries around the world still being hit by semiconductor shortages, chip companies need to embrace smart manufacturing practices to boost production. In this blog, we talk about what those practices are and how to accelerate their adoption.
Read more

Is Fear Holding Back The Chip Industry’s Future In The Cloud?

The semiconductor industry is at the cutting edge of technology – so why is it still so nervous about the cloud? Persisting with an outmoded security model means missing out on significant gains in manufacturing.
Read more

Is It Possible to Improve Performance and Be More Energy Efficient?

The semiconductor industry needs to become more sustainable in a world of increasing demand – optimization holds the key.
Read more

Investigating Operational Decisions and Their Impact on Energy Efficiency in Wafer Fabs

Chipmakers will encounter major challenges before the end of the decade in their quest to achieve stringent emissions goals. In light of this, we are working on an initiative to explore innovative approaches for reducing the carbon impact of the semiconductor sector.
Read more

Flexciton’s Software Trial at Renesas Tackles One of the Most Complex Aspects of Fab Scheduling

Timelinks are one of the most challenging scheduling problems found in a wafer fab and were causing a particular problem for Renesas Electronics' US fab. After seeing the potential performance gains with our software trial, they decided to go ahead with full implementation.
Read more

Heuristics or Mathematical Optimization: Which is the Best Method for Wafer Fab Scheduling?

Scheduling a wafer fab to run optimally is one of the most challenging mathematical problems that exists in modern-day manufacturing. Why?
Read more

Innovate UK invests in breakthrough technology developed by Flexciton and Seagate

Innovate UK, part of UK Research and Innovation, has invested in Flexciton and Seagate Technology's production planning project to help improve UK semiconductor manufacturing.
Read more

Harnessing AI's Potential: Revolutionizing Semiconductor Manufacturing

AI has unquestionably stood out as the prevailing technological theme of the year. This wave of innovation begs the question: how can the semiconductor industry, which stands at the heart of technological progress, leverage AI to navigate its own intricate challenges?
Read more

Flexciton and Seagate Technology to Present at SEMI's Upcoming FutureFab Solutions Webinar

What will the future of wafer fabrication look like? With innovative AI-driven technologies paving the way for significant improvements in efficiency, quality and on-time delivery whilst also driving down costs – chip manufacturers need to be paying close attention.
Read more

Fab-Wide Scheduling of Semiconductor Plants: A Large-Scale Industrial Deployment Case Study

Decision-making in wafer fabs is a two-level problem. On one hand, fab-wide scheduling is tasked with the strategic management of factory assets. On the other hand, toolset-level scheduling focuses on the operation of individual work centres.
Read more

EU Chips Act Proposes €43 Billion Of Support – But How Will It Be Spent?

The European Commission has set out an ambitious plan to double the EU’s share of the semiconductor market to 20% by 2030. But is increasing production capacity the way forward? In this blog, we look at where they should and shouldn’t be spending their money to achieve this aim.
Read more

Flexciton Announces £15M Series A to Boost the Capability of the Global Semiconductor Industry

Since its inception, Flexciton has received over £21m in funding, with its recent Series A round raising a total of £15m. The Series A investment will be used for hiring across different areas of the team.
Read more

Webinar: Flexciton and Seagate Case Study

Jamie Potter, CEO & Co-founder of Flexciton and Tina O'Donnell, Systems Engineering Manager from Seagate discussed advanced scheduling technology and its impact on wafer fab production performance.
Read more

Flexciton Return to Present at FMF 2022 For This Year's SEMICON Europa

This year, Flexciton will be returning to Munich, Germany for SEMICON Europa and the 2022 Fab Management Forum and we're thrilled to announce that we'll be silver sponsors of the event!
Read more

Flexciton Cofounders Reflect on Their Five Year Journey

The past 12 months have been intensely positive, bringing new exciting projects and allowing the company to accelerate its growth. We took this opportunity and asked Flexciton's cofounders to reflect on their journey.
Read more

C is for Cycle Time [Part 1]

This two-part article aims to explain how we can improve cycle time in front-end semiconductor manufacturing through innovative solutions. In part 1, we discuss the importance of cycle time for manufacturers and introduce the operating curve to relate cycle time to factory utilization.
Read more

C is for Cycle Time [Part 2]

In part 2, Dennis explores strategies to enhance cycle time through advanced scheduling solutions, contrasting them with traditional methods. He uses the operating curve, this time to demonstrate how AI scheduling and operational factors, such as product mix, can significantly impact cycle time.
Read more

B is for Batching

In the second instalment of the Flexciton Tech Glossary Series, we're taking you on an insightful journey through the world of batching. Find out about the many complexities of batching, the existing methods of solving the problem and the wider solution space.
Read more

Could Reinforcement Learning Play a Part in the Future of Wafer Fab Scheduling? [Tech Paper Review]

Jannik Post – one of our optimization engineers – takes a look at the background of the Reinforcement Learning methodology, before reviewing two recent publications which apply Reinforcement Learning to scheduling problems.
Read more

Come and Visit Our Booth at SEMICON West This July!

From 11–13 July 2023, Flexciton will be returning to San Francisco for this the latest edition of SEMICON West. And this time, we’ll be joining the Techworks / NMI members zone, where we will have our own stand – located at booth 945.
Read more

A is for AI

We are excited to introduce the Flexciton Tech Glossary Blog Series: A deep dive into the A-Z of semiconductor technology and innovation. In the first edition of the series, Ioannis Konstantelos and Dennis Xenos take a dive into AI and its applications in semiconductor manufacturing.
Read more

A Hot Topic: What Makes Scheduling the Diffusion Area so Challenging? [Tech Paper Review]

The diffusion area is particularly important to the smooth operation of a wafer fab. Not only does it receive raw wafers at the very beginning of the fabrication process but it also interacts with many other areas of the fab.
Read more

A Fab Manager's Dilemma: Maintenance Scheduling vs Productivity KPIs

A typical approach is to plan maintenance activities ahead of time using simple rules-based models, where the maintenance is run on a particular day, at a particular time. The consequence of such approach, however, is optimising maintenance timing at the expense of production KPIs such as cycle time and throughput.
Read more

Autonomous Scheduling: A Tale of Three Taxis

At Flexciton, we often talk about how autonomous scheduling allows wafer fabs to surpass the need for maintaining many rules to enable the behaviours they want at different toolsets. Seb Steele offers an analogy to show how significant the difference is.
Read more

Accelerating the Future Panel Discussion: Key Takeaways from Industry Leaders

Staying ahead in smart manufacturing technologies has become paramount for global competitiveness. This topic was the focal point of the recent panel discussion webinar hosted by Flexciton.
Read more

Five Reasons Why Your Wafer Fab Should Be Using Hybrid Optimization Scheduling

Fabs usually approach scheduling in one of two ways; the heuristic approach, which is fast but not optimal and the mathematical approach, which is optimal but time-consuming. In order to attain optimal results that are able to keep up with changes on the factory floor – fabs should consider a hybrid approach.
Read more
View all

Speak to one of our experts

Book a demo session or simply reach out to one of our experts to learn more about what Autonomous Technology could do for your fab. 

Book a demo
Subscribe to receive the latest articles, publications and news.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Explore
HomeProductsSolutionsResourcesGlossary
Company
About usCareersTeamBlog & News
Contact
Get in touchRequest a demoFAQ

Powering your autonomous factory transition.

X
LinkedIn
© 2025 Flexciton. All rights reserved.
Privacy PolicyTerms of ServiceSecurity